Second-Floor Project Taking Shape

The second-floor renovation project at Elan Skilled Nursing and Rehab is progressing, with the delivery of critical pieces of equipment and the continued updating of the space.

HVAC units arrived recently and spaces are being developed as the expansion draws near the expected completion in spring 2023. The project is funded through foundation grants and Individual donations. When finished, the revision will feature a state-of-the-art, 1,200-square-foot Dialysis Den that will allow residents to receive the same care in our facility as they would in a dialysis center.

Photos are included in this post.

When finished, the revision will feature a state-of-the-art, 1,200-square-foot Dialysis Den that will allow residents to receive the same care in our facility as they would in a dialysis center.

Elan Skilled Nursing and Rehab is partnering with DaVita Dialysis to develop the space, which will accommodate up to 30 residents in need of transitional care to bridge the gap between their hospital stay and a return home.

This dialysis section is just part of the renovation, which also includes updated flooring, paint, counter tops, doors, lighting and furniture.

The model of care and programming for the entire second floor will address the needs of patients who have been released from the hospital following a serious illness, injury, or surgery, but who need more time to recover before safely returning home.

Work began in June 2022.

If you find this information informative, please share this link. Also, to receive email notices of future posts, complete the E-News sign-up form on this page.

Previous stories:

  • Second-Floor Renovation Project Continues

Visit us:
1101 Vine St.
Scranton, PA 18510

Call us:
(570) 344-6177