Second-Floor Construction Project Begins  

Work began in June 2022 on the Jewish Home of Eastern PA’s second-floor renovation.

When completed, the project will feature a state-of-the-art, 1,200-square-foot Dialysis Den that will allow residents to receive the same care in our facility as they would in a dialysis center.

We are partnering with DaVita Dialysis to develop the space, which will accommodate up to 30 residents in need of transitional care to bridge the gap between their hospital stay and a return home.

This dialysis section is just part of the renovation, which also includes updated flooring, paint, counter tops, doors, lighting and furniture.

The model of care and programming for the entire second floor will be tailored to the needs of patients who have been released from the hospital following a serious illness, injury, or surgery, but need more time to recover before safely returning home.

This story includes several photos from July, showing our progress. Look for updates demonstrating the progress of this important addition to our facility.

Visit us:
1101 Vine St.
Scranton, PA 18510

Call us:
(570) 344-6177